Two suppliers quote the same FOB price, the same lead time and the same specification. One asks for 30 per cent up front and the balance against a copy of the bill of lading. The other asks for 50 and 50. The gap between those two offers is not a gap in the price of the goods. It is a disagreement about which side holds money it cannot yet see a return on, and for how many weeks.
Payment terms are usually negotiated last, after price and lead time, which is the wrong order. Price tells you what the order costs if everything works. Terms tell you what you still own if it doesn’t.
This is written for buyers who have already agreed a price and are now looking at a payment schedule they are not sure how to read. It maps four structures to the risk each one transfers, and it spends most of its time on the part that causes the arguments: the moment the balance is released.
The four structures you will actually be offered
Almost every quotation resolves into one of these. The differences that matter are in the third and fourth columns, not the first.
| Structure | Paid before goods move | Who carries the gap | Where it breaks |
|---|---|---|---|
| 30/70 T/T: 30% deposit, 70% against B/L copy | 30% | Buyer, from the day the balance clears | The balance is paid before any carton can be opened |
| L/C at sight | Only the opening cost | The bank, against documents | Documents can be fully compliant and the goods still wrong |
| Deposit plus balance against an inspection report | 30% | Shared, with a named control point | Only works if the report is written as a release condition |
| Open account, 30 or 60 days | Nothing | Supplier, until the due date | Priced into the quotation; not offered on a first order |
Most buyers end up in the first row because it is what a supplier quotes when nobody asks a second question. It is also the row with the widest gap between what the buyer thinks they have bought and what they have actually bought: a promise that a container was loaded.
A clause is not a mechanism
Writing “balance against B/L copy” into a contract feels like control. It is a description of a document, not a control over goods.
A bill of lading attests that a carrier received a sealed container of a stated weight and count. It says nothing about whether the contents match the sealed sample, whether the cartons were packed to the specification, or whether the quantity inside is the quantity on the invoice. By the time the copy reaches you, the container is usually already at the terminal, and the supplier has been paid.

The same is true of a proforma invoice clause, a “quality guarantee” paragraph, or a supplier’s own promise to “arrange inspection before shipment”. None of them creates a step where money stops until something is verified. They create a step where money moves and a conversation may follow.
Why 50/50 is not a compromise
A 50/50 split is often proposed as the fair middle, and it is the most common way to make a payment schedule worse while making it feel more balanced.
It moves the split without adding a control point. You now pay half before production starts and half before you have any document that describes the goods. Two exposures instead of one, and the second one is still triggered by nothing more than the supplier saying the order is ready.
A compromise on payment terms is not a number between 30 and 50. It is a payment schedule with a milestone that a third party can verify, at a moment when the money can still be stopped.
The inspection report as a payment gate
An inspection only functions as a gate if the report is written before the order starts, and if the contract says the balance is not payable until it is issued. Four things have to be in it for that to hold.
The sampling plan and the acceptance level, named in the contract rather than agreed on the day. The defect classes, defined, with the boundary between major and minor written down. Photographs of the cartons and the units that were actually examined, labelled with the date and the quantity represented. And a named person or body who keeps the sealed sample the inspection is measured against.
Most disputes about inspection are not disputes about quality. They are disputes about which sample the goods were compared to.
That is the part we are strict about on orders we run: the inspection is booked against the sealed sample and the approved specification, and the balance is called only after the report is issued. It costs a few days at the end of production, and it is the only point in a 30/70 schedule where the buyer still has leverage.
An inspection that happens after the balance has been paid is not a control. It is a complaint procedure with photographs.
Where the audit ends and the inspection begins is a separate question, and it decides whether either document is worth paying for: a factory audit and a pre-shipment inspection answer different questions, and only one of them is about the goods in front of you.
Where the money sits when five suppliers ship in one container
A consolidated order has five payment schedules, five suppliers and one container, and the container cannot sail until the last supplier has been paid. Every supplier in that group knows it. That is the structural weakness of consolidation, and it has nothing to do with the consolidator’s competence.

It shows up in predictable ways. One supplier’s balance is delayed by a bank query, so the container misses its cut-off and everybody’s cargo waits a week. One supplier finishes late, so the others’ balances have already been paid and their goods are sitting in a warehouse against a booking that keeps moving. Or the buyer pays each supplier separately, discovers on loading day that one of them has not actually received the money, and the container is held at the gate.
The fix is administrative, not commercial. One payment calendar keyed to the container’s estimated departure, not to each supplier’s production finish. One party responsible for calling balances, so that the loading plan and the payment plan are the same document. And a written rule, agreed before the order, about what happens when one supplier cannot meet the loading date: ship without it, hold for it, or re-sequence. Coordinating distributed supplier shipments is mostly this rule, applied before the money moves.
When we consolidate, we are the exporter named on the export documents, which means the receivable is ours to carry rather than each factory’s to chase. That is not a favour to the buyer; it is the reason a single loading plan can be enforced at all.
The documents that are release conditions, and the ones that are not
Most orders arrive with a stack of paperwork in which two documents are release conditions and the rest are shipping formalities. Deciding which is which before the balance is called is the whole exercise.
-
Commercial invoice and packing list, matched line by line to the purchase order. A packing list that reconciles to the invoice but not to the PO is the most common reason a balance is paid against the wrong quantity.
-
Bill of lading, and whether you get an original set or a telex release. This changes who controls the cargo at destination, and it should be decided before shipment, not after.
-
Inspection report, signed and dated, with the sample reference. This is the document that should release the balance.
-
Certificate of origin, test reports and certificates specific to the category. Required at destination; not a reason to delay a balance if they exist and are correct.
-
Insurance certificate, if the term puts risk on you. On FOB and FCA the risk passes before the main carriage, which is the point at which most buyers find out they were never covered.
The practical move is to list the two or three documents you require before payment and write that list into the payment clause. Everything else belongs in the shipping instructions.
Currency, bank charges and the part nobody quotes
Payment terms and settlement currency are usually negotiated by two different people, and the gap between them is where the surprises live.
Ask for the all-in figure in the currency you will actually pay, dated, including the correspondent bank charges. On a 30/70 schedule with two transfers, charges are taken twice, and the question of who pays them — the sender, the receiver, or shared — is answered differently by different suppliers. A supplier quoting in renminbi while you pay in US dollars has also built in a conversion spread that will not appear on the quotation.
None of this is large per order. All of it is invisible until someone reconciles the bank statement against the proforma, which is usually three months later.
Retention: what the last 10 per cent can and cannot buy
Holding back a final 10 or 20 per cent for 30 or 60 days after arrival is the most common form of protection buyers ask for, and it is worth being precise about what it does.
It buys attention. A supplier with money outstanding answers emails about a damaged carton that a supplier with a closed file does not.
It does not buy a remedy if the problem is systemic. If a defect runs through the whole production, a retention of 10 per cent will not cover rework, replacement and the freight to fix it, and no supplier prices a schedule on the assumption that they will forfeit it. A retention is a claim shortcut, not insurance.
The clause that does the work is not the percentage. It is what the contract says happens if the goods fail inspection: who decides, in how many days, and what the supplier owes. A retention without that clause is a delay with a number attached.
The scenario worth writing it against is not a single damaged carton. It is one supplier failing pre-shipment inspection with the rest of the container already paid for, which is the case where a percentage decides nothing and a written rule decides everything.
What to put in the payment clause
Six items, none of them long.
-
The schedule, tied to named milestones and named documents, not to calendar days after an undefined event.
-
Who inspects, against which standard, by when, and what happens if the report is late.
-
The release condition for the balance, written as a sentence a bank clerk could act on.
-
The remedy for late delivery and for failed inspection, with amounts, not adjectives.
-
The rule for partial shipment: whether a short quantity delays the whole balance or is settled separately.
-
Bank details verified against the registered company name, in writing, before the first transfer.
The question to ask before you sign
Not “what are your payment terms”. Every supplier answers that in one line, and the answer is always a pair of percentages.
Ask instead which document releases the balance, who produces it, and how many days before the vessel sails it is due. A supplier who answers that precisely has done this before with a buyer who checked. A supplier who answers with a percentage has told you that the schedule is a cash-flow arrangement, not a control — which is fine, as long as you know that is what you bought.